Tesla clearing more Grünheide land to start the construction of new buildings at Giga Berlin

-

-Advertisement-

Tesla has started clearing more land area at its Gigafactory in Berlin-Brandenburg to make room to begin the construction of new buildings in the near future.

According to a German news outlet MOZ, the tree felling work at the dense Grünheide pine plantation started today.

Local observer Tobias Lindh says that Tesla does not require any more permits to clear additional land areas at Giga Berlin.

However, according to rbb24, Tesla currently plans to clear 70 hectares (~173 acres) of land for the plans the automaker has in the pipeline for the next developments (watch the latest aerial footage below).

Tesla Model Y Accessories by EVANNEX (Sponsored Banner).
– Sponsored –

This preparation of land is for the 2nd phase of Giga Berlin construction. Multiple buildings of the 1st phase are still under construction even after Tesla Model Y production has gained significant momentum at the factory already.

This new land area clearance is going to happen on the Northern side of Giga Berlin. MOZ reports that this tree felling and land clearance work is targeted to be completed within a week.

In the meantime, Tesla is preparing its paperwork to apply for permits and permissions to start new building constructions in the phase 2 area of Giga Berlin.

Historically, tree felling at Grunheide has been a matter of concern for environmentalists. But Tesla has most probably sorted it out by re-foresting the areas around the factory once the building construction and plumbing are in place. So far, Tesla has reportedly re-forested 300 hectares (~741 acres) of land around and near Giga Berlin.

– Advertisement –

“I am pleased that Tesla is continuing. This is a good sign: Tesla is focusing on Brandenburg. Our country is developing into a place of modern mobility. As the largest industrial employer and trainer in Brandenburg, Tesla has played a decisive role in this,” Jörg Steinbach the Minister for Economy, Labor, and Energy of the State of Brandenburg issued a statement on Twitter today.

During the Q3 2022 Earnings Call last week, Tesla CEO Elon Musk said that Giga Berlin has reached a production rate of 2,000 Model Y electric SUVs per week and is steadily ramping up even more. This was a rapid increment from the rate of 1,000 Model Ys produced per week which Tesla announced back in June.

7,000 people are currently employed at Giga Berlin and as phase 1 construction completes it’s expected to have 12,000 engineers and workers employed in it. The expansion to phase 2 will bring in more job opportunities for the residents of Berlin, Brandenburg, Germany, and Europe.

Stay tuned for constant Tesla updates. Follow us on: 
Google News | Flipboard | X (Twitter) | WhatsApp Channel | RSS (Feedly).

Video: Giga Berlin aerial coverage from 27th October 2022.
Iqtidar Ali
Iqtidar Alihttp://www.teslaoracle.com
Author of more than 1500 articles on Tesla, SpaceX, and EVs. His work has been liked and tweeted by Elon Musk and other prominent influencers. You can reach him on Twitter @IqtidarAlii

Latest News

After Starship’s 60-second 6-engine static fire, SpaceX rolls out Flight 14 Booster 21 for pre-launch testing

SpaceX (NASDAQ: SPCX) performed a major engine test on the Flight 14 upper-stage spacecraft, i.e., Starship 41 (Ship 41/S41)....

Flight 13 Starship (S40) completes one month in the Indian Ocean, watch the latest recovery efforts by SpaceX

The lucky and now seemingly unfortunate Flight 13 Starship upper stage (Ship 40) is still floating in the Indian...

Tesla to hold the Cybercab Austin, Texas launch event on September 3

Elon Musk's electric-vehicle, real-world AI, and robotics company, Tesla (NASDAQ: TSLA), has announced the date of the Cybercab's Austin,...

Tesla Cybercabs spotted AI-learning multi-lane stop signs at Giga Texas (FSD v15) ahead of Austin launch

Tesla (TSLA) is working to launch its autonomous ride-hailing service using the Cyebrcab vehicles in Austin, Texas. Currently, Tesla...
- Advertisement -

After Starship’s 60-second 6-engine static fire, SpaceX rolls out Flight 14 Booster 21 for pre-launch testing

SpaceX (NASDAQ: SPCX) performed a major engine test on the Flight 14 upper-stage spacecraft, i.e., Starship 41 (Ship 41/S41)....

Flight 13 Starship (S40) completes one month in the Indian Ocean, watch the latest recovery efforts by SpaceX

The lucky and now seemingly unfortunate Flight 13 Starship upper stage (Ship 40) is still floating in the Indian...

Starship Flight 14: SpaceX performs a single-engine static fire test on Ship 41, Starbase updates (videos)

SpaceX (SPCX) has entered the pre-launch testing phase of its next Starship launch-and-landing test (IFT-14). Yesterday (August 19), SpaceX moved...

Tesla Tips & Tricks

Tesla Quarterly Reports & Eearnings

- Advertisement -

You might also likeRELATED
Recommended for You